Logo

Social Icons

Shandong Dezhou Ground source heat pump Project

In general

The park covers an area of 505 mu with a total investment of 473 million yuan. The park uses "medium and deep geothermal energy" to replace "natural gas", in accordance with the principle of "irrigated production", the construction of 4 mining Wells, 6 recharge Wells, and the use of "high temperature water source heat pump" technology, the construction of a geothermal energy station, the total heating capacity of about 21,712kW, can meet the 254,000 square meters of greenhouse heat demand.

Features

The project adopts the three-stage heat transfer mode, and after the geothermal water (52℃) is exchanged by the three-stage heat exchanger (about 17℃), it is pumped back to the Neogene Guantao formation at a depth of 1200m through the recharge well, so as to achieve "the same amount of recharge in the same layer, and the heat extraction does not consume water", so as to promote the sustainable development and utilization of geothermal energy. Through the efficient use of geothermal resources, it can save 101,500 tons of standard coal, reduce 24,000 tons of carbon dioxide, and save more than 11 million yuan in operating costs per year.

Role

PM, Operate